The opening of the new hub in Brendola (VI) represents a significant investment in the expansion of Transpack’s facilities network in the area. Its strategic location, just 1.5 km from the A4 Montecchio Maggiore exit, positions it as a key element in the optimisation of packaging, shipping and distribution activities in the area.

NEW HUB IN BRENDOLA

The new Transpack Brendola hub will provide customized services in order to support companies with quality logistics projects, contributing to the full efficiency of Supply Chain Management.

CHARACTERISTICS

  • industrial building on rectangular plan, mesh 17x10m
  • 9,000 m2 covered area, 8.55m internal height
  • 4 overhead cranes capacity 25t

VIABILITY

  • 1′ from the A4 TURIN – TRIESTE freeway
    (Montecchio freeway exit)
  • 40′ Valerio Catullo Airport (VR)
  • 50′ Port of Marghera (VE)
brendola-stabilimento-viabilità

PLANNED ACTIVITIES

PACKAGING

  • Packaging engineering and production
  • Loading plans processing
  • Management and issuance of packing lists
  • Containerizing / flatrack
  • Storage
Nuovo stabilimento Transpack Brendola

TRANSPORT

  • Handling, break-bulk and supercargo transportation
  • EPC design review and technical specifications
  • ASME B.30.20 Below The Hook Lifting Analysis
  • Carrier and shipper coordination
Nuovo stabilimento Transpack Brendola trasporti

SHIPMENTS

  • ISO container volumetric assessment and optimization
  • Filling prescriptions, container anchorage related
  • Assessment and volumetric optimization of air shipments
  • Supervision of container cargo securing
  • Carrier and shipper coordination
Nuovo stabilimento Transpack Brendola

For more information